2018

Buenos Aires

100 MV Energética I wind power station– Electric EPC

Build of 33 kV underground wiring of 21.74 (23 km) of length. Building of new 132/34.5/13.8 kV, 110 MVA Transformer Station; single busbar arrangement of 132 kV. Tornquist new 132 kV line opening – Bahía Blanca; control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System) Power station was powered in seven months.