OUR WORKS

COUNTRY

Distrocuyo, which is headquartered in Argentina, has expanded and consolidated in the Latin American market and it has broadened its services through Distrocuyo Chile S.A. and SEIS S.A., consolidating its international presence and its expansion plan in the region.

WORKS

...

2020

Mendoza

Civil, electromechanical and electrical engineering works related to the project

Construction of pad foundation for 13.2 kV bay assembly, 13.2 kV bay electromechanical assembly, electrical connection of 13.2 kV busbar to current bay switchgear, auxiliary transformer modifications, DC and AC wiring, signals and communications in new 13.2 bay. Excavation, conductor wiring, and installation of terminal points in 13.2 kV conductor. Provision and assembly of SMEC (Commercial Measuring System) in the electrical room of Bajo Río Tunuyán Transformer Station. Commissioning of equipment.

...

2020

Mendoza

33 kV MV line construction (medium-voltage line) of 17.39 mi (28 km) long; 13.2 kV MV line construction of 3.72 mi (6 km) long + LLANCANELO field Transformer Substation.
...

2019

Neuquén

Construction of electric power infrastructure in Añelo industrial parks

Electric EPC, provision, construction, assembly, and commissioning of 33/13.2 kV, 10 MVA transformer station known as SET Añelo Urbana, 33 kV double-circuit line which will interconnect existing Loma Campana Transformer Station with SET. These 13.2 kV lines will power North and South Industrial Parks, and 8 electrical transformation centers will be allocated in them, switchgear and protective systems.

...

2019

Neuquén

132 kV high-voltage lines maintenance and Loma Campana Transformer Station maintenance

Maintenance during a 24 months period of 132 kV high-voltage, double-circuit line of 1.24 mi (2 km) of length, and maintenance of Loma Campana Transformer Station. Añelo. Build of 33 kV aerial cable of 21.74 (35 km) of length.

...

2019

Neuquén

100 MW Vientos Neuquinos wind power station – Electric EPC

Building of new 132/34.5/13.8 kV, 110 MVA Transformer Station; single busbar arrangement of 132 kV. 132 kV double-circuit line opening in Piedra del Águila - Choconcito; control and protective systems adjustment; replacement of equipments at both ends of Chocón and Piedra del Águila Transformer Stations. Engineering, provision, construction, assembly, and commissioning, control and protective system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

...

2018

Buenos Aires

100 MV Energética I wind power station– Electric EPC

Build of 33 kV underground wiring of 21.74 (23 km) of length. Building of new 132/34.5/13.8 kV, 110 MVA Transformer Station; single busbar arrangement of 132 kV. Tornquist new 132 kV line opening - Bahía Blanca; control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System) Power station was powered in seven months.

...

2018

Neuquén

Operation and Maintenance - Entered into an agreement in 2017

Operation and Maintenance of EPEN´s facilities, consisting of 132 kV lines of 463.54 mi (746 km) of length, and 11 transformer stations.

...

2018

Neuquén

EPEN Electric infrastructure operation and maintenance – Complementary works

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.

...

2018

Neuquén

EPEN Electric infrastructure operation and maintenance – January to May 2018

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.

...

2018

Neuquén

EPEN Electric infrastructure operation and maintenance – 2018/2022 term

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.

...

2018

Mendoza

Luján de Cuyo 132 kV Transformer Station extension

EPC Contract- Civil engineering, electromechanical and electrical works. Provision of equipment for medium voltage and communication systems and automation systems, and fiber optic. Building, electro-mechanical assembly and commissioning. Civil engineering works and 13.2 kV underground wiring.

...

2018

Mendoza

132 kV Electrical Maintenance at Electrical Substation No. 100-CILC

Two-year-contract for electrical facilities maintenance; and high-voltage maintenance at 132 kV Electrical Substation No. 100, located at Luján de Cuyo Industrial Park. On-call duties; preventive and corrective maintenance; underground wire maintenance, among other complementary works related to medium and high-voltage.

...

2017

Neuquén

33 kV line and Aguada San Roque Transformer Station – Electric EPC

Engineering, provision, construction, assembly, and commissioning of 33 kV line of 0.93 mi (1.5 km), control and protection system, communication system. 33 kV bay exension.

...

2017

Chubut

Madryn wind power station. 70 MW MADRYN I Y II – Electric EPC

Construction of a 33 kV underground wiring of 46.60 mi (75 km) of length. Building of new 132/34.5/13.8 kV; 4 x 60 MVA Transformer Station. Construction of a 132 kV double-circuit line underground of 12.42 (20 km) of length. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

...

2017

Chubut

30 MW Chubut Norte wind power station – Electric EPC

Construction of a 33 kV underground wiring of 8.07 (13 km) of length. Building of new 132/34.5/13.8 kV; 60 MVA Transformer Station. Construction of a 132 kV double-circuit line of 10.56 mi (17 km) of length, and its connection to Puerto Madryn 330/132 kV Electrical Station. Construction of a 132 kV double-circuit line of 13.67 mi (22 km) of length, and its connection to PY 500/132 kV bus bar. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

...

2017

Mendoza

Parque de Interconexión del Parque Industrial Petroquímico (PI PIP)

EPC Contract. Provision, assembly and commissioning of 132 kV high-voltage line opening in Cacheuta - Luján de Cuyo, which constitutes second feeder of 132/13.2 kV Parque Industrial Petroquímico (PIP) Transformer Station.

...

2017

Buenos Aires

100 MV La Castellana wind power station – Electric EPC

Build of 33 kV aerial cable of 13.67 mi (22 km) of length with network connection point to the wind turbine generator system. Building of new 132/33; 2 x 60 MVA Transformer Station. Construction of a 132 kV high-voltage, single-circuit transmission line of 22.99 mi (37 km) of length. Chañares new 132 line switchgear bay in control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

...

2017

Neuquén

EPEN electric infrastructure operation and maintenance – 2017 term

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén.

...

2017

Mendoza

Level II maintenance – The European Space Agency (Agencia Espacial Europea)

Level II maintenance of the Deep Space Antenna (Antena de Espacio Profundo) of the The European Space Agency.

...

2016

Neuquén

40 MW Transformer Station extension of the Anchoris thermal power station.

Transformer Station extension of Anchoris. Construction of two 132 kV line switchgear bays. Civil engineering and eletromechanical works; maintenance of SMEC Commercial Measurement System; and maintenance of SOTR real-time operating system.

...

2016

Neuquén

Loma Campana Transformer Station extension - Field 10

Field 10 complete equipment for Loma Campana thermal power station. It includes bypass disconnect switches. Provision, extension and system adequacy: connection and engineering related to overcurrent, motor and overload protection relay of field 10. Engineering, provision, assembly, and commissioning, communication lines; SCADA; and SOTR real-time operating system.

...

2016

Neuquén

Extension of 3 bays at Loma Campana Transformer Station

Provision; assembly and commissioning of switchgear equipments and their equipment foundations; main and transfer bus arrangement; frames; plain conductors; insulator strings; mounting hardware of 132 kV double bus bar arrangement with three equipped bays.

...

2016

Mendoza

Electrical work at El Portón Field

Construction of high-voltage and low-voltage aerial cable; shield wire Optical Ground Wire (OPGW); build of Transformer Substation and switching stations in the Southern area of Mendoza.

...

2016

Neuquén

EPEN electric infrastructure operation and maintenance – 2016 term.

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén.

...

2016

Mendoza

Maintenance of electric island automation

Operation and Maintenance of bus bars; coupler bay between current busbars and Luján new Transformer Station; coupler bay between current AA busbars; Luján de Cuyo new electric island; control and communication systems that are owned by the carrier; Operation and Maintenance of high-voltage line bays.

Learn more
...

2020

Linares Norte
Increase capacity of 1x66 kV MV line of Tap Linares Norte
Single busbar arrangement of 66 kV. Bus bar extension in 154 kV bay; building of 1x154 kV line switchgear bay; transformer installation of 154/66 kV, 75 MVA; construction of bus section bays. Bus bar extension in 66 kV bay; construction of bus coupler bay; relocation of line switchgear bay, building of bus coupler bay. Complementary work such as increase in capacity of 1x66 kV line with a length of 1.44 miles (2.32 km) and replacement of conductor for a 60 MVA conductor; construction of electrical room.
...

2020

Puchuncaví

110 /33 kV Puchuncaví Electrical Substation and 2 x 110 kV high-voltage line

Turnkey contract for engineering, supply, construction, and commissioning of 110 / 33 kV Pacífico Substation, and of 2 x 110 kV high-voltage line, and line opening of 2 x 110 kV at current Ventanas Torquemada.

...

2020

San Clemente

66/13.2 KV, 20 MVA San Clemente Electrical Substation extension

Single busbar arrangement of 66 kV. 66 kV bay modification; transformer installation of 66/13.2kV 20MVA. Adding two new feeders to 13.8 kV. Complementary work related to electrical room extension.

...

2020

Lihueimo

66/13.8 kV, 15 MVA Lihueimo Electrical Substation extension

Single busbar arrangement of 66 kV; provision of 66 kV T2 transformer bay, 66/13.8 kV,15 MVA transformer replacement. New bus-bar for feeder No. 4 at 13.8 kV, and new bus coupler.

...

2020

Loreto

66/15 kV, 20 MVA Loreto Electrical Substation extension

Double bus arrangement of 154 kV, and transfer bus. In 154 kV bay, extension of main bus bar 1 and 2; transfer bus extension; construction of bays A3 and A4; line switchgear bays (transformer switchgear bay, coupler bay), and transformer 154/66/14.8 kV 75 MVA. Transfer bus in 66 kV bay.

...

2020

Fátima

154/66/14.8 kV, 75 MVA Fátima Electrical Substation extension

Double bus arrangement of 154 kV, and transfer bus. In 154 kV bay, extension of main bus bar 1 and 2; transfer bus extension; construction of bays A3 and A4; line switchgear bays (transformer switchgear bay, coupler bay), and transformer 154/66/14,8 kV 75 MVA. Transfer bus in 66 kV bay.

...

2020

Alto Melipilla

110 kV Alto Melipilla Electrical Substation extension

In 110 kV bay, bus bar extension for 2 x 110 kV line connection.

...

2020

Mandinga

66/13.8 kV, 15 MVA Mandinga Electrical Substation extension

In 66 kV bay, 66/13.8 kV 15 MVA transformer replacement. In 13.8 kV bay, 13.8 kV switchgear area extension, and construction of 2 feeders. Complementary work related to new electrical room construction, and transformer replacement of auxiliary transformer.

...

2020

Chocalán

66/13.5 kV, 20 MVA Chocalán Electrical Substation extension

In 66 kV bay, bus bar extension, and 66/13.5 kV 20 MVA transformer replacement. Electrical works in 13.8 kV: switchgear bay extension, feeder relocation and new feeder bays 3 and 4. Complementary work related to electrical room, and connection of new auxiliary transformer.

...

2020

Casablanca

66/12 kV, 30 MVA Casablanca Electrical Substation extension

Single busbar arrangement of 66 kV. In 66 kV, 66/12 kV 30 MVA transformer installation, T1 coupler bay, T2 coupler bay, and new busbar. In 13.8 kV, T1 coupler bay, T2 coupler bay, and busbar extension in three areas, among other performed tasks.

...

2020

El Totoral

66/12 kV, 15 MVA El Totoral Electrical Substation extension

Single busbar arrangement of 66 kV; construction of 66 kV switchgear bay and transformer installation of 66/12 kV, 15 MVA; 12 kV busbar extension; new bay with 12 kV feed. Next incoming work: complementary work related to electrical room.

...

2020

Reñaca

Bosquemar 1x110 kV line – Tap Reñaca – Reñaca

Second electric wiring between TAP Reñaca and Reñaca Electrical Substation of 7.14 mi (11.5 km) of length, employing existing structures. Concón-Bosquemar 1x110 kV line modification. Complementary works of 110 kV switchgear bay Reñaca Electrical Substation, coupler bay in Reñaca Electrical Substation, electrical room, Bosquemar 110 kV Electrical Substation section 2 bus bar extension.

...

2020

Cumbre

220 kV Cumbre Electrical Substation extension

Extension of equipment pad, main bus bars and of every common facilities of 220 kV switchgear area of the Cumbre breaker-and-a-half substation configuration. Medium-voltage switchgear adjustment; adjustment of protective equipment; communication lines; SCADA (Supervisory Control and Data Acquisition system); civil engineering works; assembly; grounding electrode; and testing of new equipment; among other works.

...

2020

Nueva Pan de Azúcar

220 kV Nueva Pan de Azúcar Electrical Substation extension

220 kV Nueva Pan de Azúcar Electrical Substation switchgear extension by of addition of new control switch, medium-voltage switchgear adjustment; adjustment of protective equipment; communication lines; SCADA (Supervisory Control and Data Acquisition system); civil engineering works; assembly; grounding electrode; and testing of new equipment; among other works.

...

2020

Maitencillo - Nueva Maitencillo

Maitencillo 2x220 kV line increase capacity - Nueva Maitencillo

220 kV transmission line replacement Maitencillo– Nueva Maitencillo; equipments substitution; communication lines; SCADA (Supervisory Control and Data Acquisition system); teleprotection system; grounding electrode; civil engineering works; among other works.

...

2020

Valdivia

220/23 kV, 60 MVA Valdivia Electrical Substation extension

Transformer installation of 220/23 kV, 60 MVA, with corresponding bays at both voltage levels; construction of 23 kV switchgear bay that consists of a busbar with 8 bays; channels for 23 kV underground feeders. Build of 66 kV switchgear of main and transfer bus arrangement, with five extra spaces for additional bays; 220/66 kV, 60 MVA transformer installation with corresponding bays at both voltage levels; and channel for 66 kV underground feeders.

...

2020

Linares Norte

Increase capacity of 1x66 kV MV line of Tap Linares Norte

Single busbar arrangement of 66 kV. Bus bar extension in 154 kV bay; building of 1x154 kV line switchgear bay; transformer installation of 154/66 kV, 75 MVA; construction of bus section bays. Bus bar extension in 66 kV bay; construction of bus coupler bay; relocation of line switchgear bay, building of bus coupler bay. Complementary work such as increase in capacity of 1x66 kV line with a length of 1.44 miles (2.32 km) and replacement of conductor for a 60 MVA conductor; construction of electrical room.

...

2016

Chile

ERAG TAP Loma Alta Ancoa – PEHUENCHE hydroelectric power station

Engineering, provision, and assembly of ERAG (Automatic Generation Reduction and Disconnection Scheme) TAP Loma Alta Ancoa, Pehuenche hydroelectric power station.

...

2015

Chile

Maintenance of 500 kV AAGDS (Automation of Automatic Generation Disconnection Scheme) system - PDCE (Extreme Weather Event Contingency Plan).

Preventive maintenance of phase II, stages 3 and 4 of the 500 kV system operational diagram at the following 500 kV Transformer Substations: Charrúa, Antuco, El Toro, Ancoa, and Alto Jahuel. Maintenance-on-call on the system operational diagram.

see more +