2020 Posted on 3 December, 202021 December, 2020 by Dario Tower Mendoza 33 kV MV line construction (medium-voltage line) of 17.39 mi (28 km) long; 13.2 kV MV line construction of 3.72 mi (6 km) long + LLANCANELO field Transformer Substation.