2017

Chubut

30 MW Chubut Norte wind power station – Electric EPC

Construction of a 33 kV underground wiring of 8.07 (13 km) of length. Building of new 132/34.5/13.8 kV; 60 MVA Transformer Station. Construction of a 132 kV double-circuit line of 10.56 mi (17 km) of length, and its connection to Puerto Madryn 330/132 kV Electrical Station. Construction of a 132 kV double-circuit line of 13.67 mi (22 km) of length, and its connection to PY 500/132 kV bus bar. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)