2017

Chubut

Madryn wind power station. 70 MW MADRYN I Y II – Electric EPC

Construction of a 33 kV underground wiring of 46.60 mi (75 km) of length. Building of new 132/34.5/13.8 kV; 4 x 60 MVA Transformer Station. Construction of a 132 kV double-circuit line underground of 12.42 (20 km) of length. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)