2018

Neuquén

EPEN Electric infrastructure operation and maintenance – 2018/2022 term

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.