2019

Neuquén

132 kV high-voltage lines maintenance and Loma Campana Transformer Station maintenance

Maintenance during a 24 months period of 132 kV high-voltage, double-circuit line of 1.24 mi (2 km) of length, and maintenance of Loma Campana Transformer Station. Añelo. Build of 33 kV aerial cable of 21.74 (35 km) of length.