Buenos Aires
100 MV La Castellana wind power station – Electric EPC
Build of 33 kV aerial cable of 13.67 mi (22 km) of length with network connection point to the wind turbine generator system. Building of new 132/33; 2 x 60 MVA Transformer Station. Construction of a 132 kV high-voltage, single-circuit transmission line of 22.99 mi (37 km) of length. Chañares new 132 line switchgear bay in control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)