2019

Neuquén

Construction of electric power infrastructure in Añelo industrial parks

Electric EPC, provision, construction, assembly, and commissioning of 33/13.2 kV, 10 MVA transformer station known as SET Añelo Urbana, 33 kV double-circuit line which will interconnect existing Loma Campana Transformer Station with SET. These 13.2 kV lines will power North and South Industrial Parks, and 8 electrical transformation centers will be allocated in them, switchgear and protective systems.