2020

Mendoza

Civil, electromechanical and electrical engineering works related to the project

Construction of pad foundation for 13.2 kV bay assembly, 13.2 kV bay electromechanical assembly, electrical connection of 13.2 kV busbar to current bay switchgear, auxiliary transformer modifications, DC and AC wiring, signals and communications in new 13.2 bay. Excavation, conductor wiring, and installation of terminal points in 13.2 kV conductor. Provision and assembly of SMEC (Commercial Measuring System) in the electrical room of Bajo Río Tunuyán Transformer Station. Commissioning of equipment.