2017

Chubut

30 MW Chubut Norte wind power station – Electric EPC

Construction of a 33 kV underground wiring of 8.07 (13 km) of length. Building of new 132/34.5/13.8 kV; 60 MVA Transformer Station. Construction of a 132 kV double-circuit line of 10.56 mi (17 km) of length, and its connection to Puerto Madryn 330/132 kV Electrical Station. Construction of a 132 kV double-circuit line of 13.67 mi (22 km) of length, and its connection to PY 500/132 kV bus bar. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

2017

Mendoza

Parque de Interconexión del Parque Industrial Petroquímico (PI PIP)

EPC Contract. Provision, assembly and commissioning of 132 kV high-voltage line opening in Cacheuta – Luján de Cuyo, which constitutes second feeder of 132/13.2 kV Parque Industrial Petroquímico (PIP) Transformer Station.

2017

Buenos Aires

100 MV La Castellana wind power station – Electric EPC

Build of 33 kV aerial cable of 13.67 mi (22 km) of length with network connection point to the wind turbine generator system. Building of new 132/33; 2 x 60 MVA Transformer Station. Construction of a 132 kV high-voltage, single-circuit transmission line of 22.99 mi (37 km) of length. Chañares new 132 line switchgear bay in control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

2017

Neuquén

EPEN electric infrastructure operation and maintenance – 2017 term

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén.

2016

Neuquén

40 MW Transformer Station extension of the Anchoris thermal power station.

Transformer Station extension of Anchoris. Construction of two 132 kV line switchgear bays. Civil engineering and eletromechanical works; maintenance of SMEC Commercial Measurement System; and maintenance of SOTR real-time operating system.

2016

Neuquén

Loma Campana Transformer Station extension – Field 10

Field 10 complete equipment for Loma Campana thermal power station. It includes bypass disconnect switches. Provision, extension and system adequacy: connection and engineering related to overcurrent, motor and overload protection relay of field 10. Engineering, provision, assembly, and commissioning, communication lines; SCADA; and SOTR real-time operating system.

2016

Neuquén

Extension of 3 bays at Loma Campana Transformer Station

Provision; assembly and commissioning of switchgear equipments and their equipment foundations; main and transfer bus arrangement; frames; plain conductors; insulator strings; mounting hardware of 132 kV double bus bar arrangement with three equipped bays.

2016

Mendoza

Electrical work at El Portón Field

Construction of high-voltage and low-voltage aerial cable; shield wire Optical Ground Wire (OPGW); build of Transformer Substation and switching stations in the Southern area of Mendoza.

2016

Neuquén

EPEN electric infrastructure operation and maintenance – 2016 term.

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén.