2020

Mendoza

Civil, electromechanical and electrical engineering works related to the project

Construction of pad foundation for 13.2 kV bay assembly, 13.2 kV bay electromechanical assembly, electrical connection of 13.2 kV busbar to current bay switchgear, auxiliary transformer modifications, DC and AC wiring, signals and communications in new 13.2 bay. Excavation, conductor wiring, and installation of terminal points in 13.2 kV conductor. Provision and assembly of SMEC (Commercial Measuring System) in the electrical room of Bajo Río Tunuyán Transformer Station. Commissioning of equipment.

2019

Neuquén

Construction of electric power infrastructure in Añelo industrial parks

Electric EPC, provision, construction, assembly, and commissioning of 33/13.2 kV, 10 MVA transformer station known as SET Añelo Urbana, 33 kV double-circuit line which will interconnect existing Loma Campana Transformer Station with SET. These 13.2 kV lines will power North and South Industrial Parks, and 8 electrical transformation centers will be allocated in them, switchgear and protective systems.

2019

Neuquén

132 kV high-voltage lines maintenance and Loma Campana Transformer Station maintenance

Maintenance during a 24 months period of 132 kV high-voltage, double-circuit line of 1.24 mi (2 km) of length, and maintenance of Loma Campana Transformer Station. Añelo. Build of 33 kV aerial cable of 21.74 (35 km) of length.

2019

Neuquén

100 MW Vientos Neuquinos wind power station – Electric EPC

Building of new 132/34.5/13.8 kV, 110 MVA Transformer Station; single busbar arrangement of 132 kV. 132 kV double-circuit line opening in Piedra del Águila – Choconcito; control and protective systems adjustment; replacement of equipments at both ends of Chocón and Piedra del Águila Transformer Stations. Engineering, provision, construction, assembly, and commissioning, control and protective system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

2018

Buenos Aires

100 MV Energética I wind power station– Electric EPC

Build of 33 kV underground wiring of 21.74 (23 km) of length. Building of new 132/34.5/13.8 kV, 110 MVA Transformer Station; single busbar arrangement of 132 kV. Tornquist new 132 kV line opening – Bahía Blanca; control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System) Power station was powered in seven months.

2018

Neuquén

EPEN Electric infrastructure operation and maintenance – Complementary works

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.

2018

Neuquén

EPEN Electric infrastructure operation and maintenance – January to May 2018

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.

2018

Neuquén

EPEN Electric infrastructure operation and maintenance – 2018/2022 term

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén. Project was executed in 90 days.