2018

Mendoza

Luján de Cuyo 132 kV Transformer Station extension

EPC Contract- Civil engineering, electromechanical and electrical works. Provision of equipment for medium voltage and communication systems and automation systems, and fiber optic. Building, electro-mechanical assembly and commissioning. Civil engineering works and 13.2 kV underground wiring.

2018

Mendoza

132 kV Electrical Maintenance at Electrical Substation No. 100-CILC

Two-year-contract for electrical facilities maintenance; and high-voltage maintenance at 132 kV Electrical Substation No. 100, located at Luján de Cuyo Industrial Park. On-call duties; preventive and corrective maintenance; underground wire maintenance, among other complementary works related to medium and high-voltage.

2017

Neuquén

33 kV line and Aguada San Roque Transformer Station – Electric EPC

Engineering, provision, construction, assembly, and commissioning of 33 kV line of 0.93 mi (1.5 km), control and protection system, communication system. 33 kV bay exension.

2017

Chubut

Madryn wind power station. 70 MW MADRYN I Y II – Electric EPC

Construction of a 33 kV underground wiring of 46.60 mi (75 km) of length. Building of new 132/34.5/13.8 kV; 4 x 60 MVA Transformer Station. Construction of a 132 kV double-circuit line underground of 12.42 (20 km) of length. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

2017

Chubut

30 MW Chubut Norte wind power station – Electric EPC

Construction of a 33 kV underground wiring of 8.07 (13 km) of length. Building of new 132/34.5/13.8 kV; 60 MVA Transformer Station. Construction of a 132 kV double-circuit line of 10.56 mi (17 km) of length, and its connection to Puerto Madryn 330/132 kV Electrical Station. Construction of a 132 kV double-circuit line of 13.67 mi (22 km) of length, and its connection to PY 500/132 kV bus bar. Engineering, provision, construction, assembly, and commissioning, control and protection system, communication system; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

2017

Mendoza

Parque de Interconexión del Parque Industrial Petroquímico (PI PIP)

EPC Contract. Provision, assembly and commissioning of 132 kV high-voltage line opening in Cacheuta – Luján de Cuyo, which constitutes second feeder of 132/13.2 kV Parque Industrial Petroquímico (PIP) Transformer Station.

2017

Buenos Aires

100 MV La Castellana wind power station – Electric EPC

Build of 33 kV aerial cable of 13.67 mi (22 km) of length with network connection point to the wind turbine generator system. Building of new 132/33; 2 x 60 MVA Transformer Station. Construction of a 132 kV high-voltage, single-circuit transmission line of 22.99 mi (37 km) of length. Chañares new 132 line switchgear bay in control and protection systems adjustment. Engineering, provision, construction, and commissioning, capacitive compensation system, control and protection system, communication lines; Automatic Generation Disconnection; and SMEC (Commercial Measuring System)

2017

Neuquén

EPEN electric infrastructure operation and maintenance – 2017 term

Operation and Maintenance of the electrical infrastructure system of the province, which is integrated into a network of more than 434.96 (700 km) of 132 kV lines and more than a dozen of Transformer Stations with voltages of 132 kV, 66 kV and 33 kV belonging to the Ente Provincial de Energía del Neuquén.

2016

Neuquén

40 MW Transformer Station extension of the Anchoris thermal power station.

Transformer Station extension of Anchoris. Construction of two 132 kV line switchgear bays. Civil engineering and eletromechanical works; maintenance of SMEC Commercial Measurement System; and maintenance of SOTR real-time operating system.